Chapter 11 Review


Chapter 11 Review

1. In a structure chart, a____ line, which has a diamond on one end, indicates that a control module determines which subordinate modules will be invokeD:
A: method
B: condition
C: class
D: attribute

2. During ____ testing, programmers must test programs that interact with other programs and files individually, before they are integrated into the system.
A: unit
B: integrated
C: link
D: outcome

3. Many organizations require a more formal type of desk checking called a(n) ____ review.
A: design
B: integrated
C: code
D: interpolated

4. The objective of ____ testing is to identify and eliminate execution errors that could cause a program to terminate abnormally, and logic errors that could have been missed during desk checking.
A: unit
B: integration
C: user
D: system

5. ____ is the process of reviewing the program code to spot logic errors, which produce incorrect results.
A: Logic review
B: Code review
C: Results walkthrough
D: Desk checking

6. ____ describes the relationships and interdependence among modules.
A: Resolution
B: Modularity
C: Coupling
D: Dynamism

7. In ____ programming, two programmers work on the same task on the same computer.
A: parallel
B: duo
C: double
D: driver

8. To achieve better, faster, and less expensive methods of software development, ____ designed a Capability Maturity Model (CMM)®, which improves quality, reduces development time, and cuts costs.
A: ISO (International Organization for Standardization)
B: SEI (Software Engineering Institute)
C: ODBC (Open Database Connectivity)
D: CAIT (Center for the Application of Information Technologies)

9. The ____ changeover method allows the new system to be implemented in stages, or modules.
A: phased operation
B: parallel operation
C: pilot operation
D: direct cutover

10. A class diagram includes the class ____, which represent the program logiC:
A: attributes
B: events
C: methods
D: characters

11. O-O analysis makes it easier to translate an object model directly into an object-oriented programming language. This process is called object-oriented ____.
A: changeover
B: development
C: tracking
D: cycling

12. ____ measures a module's scope and processing characteristics.
A: Stimulation

B: Cohesion
C: Code review
D: Integration

13. A ____ evaluation assesses the overall quality of the information system.
A: pre-implementation
B: post-implementation
C: pilot-implementation
D: testing-implementation

14. A control couple shows a message, also called a ____ flag, which one module sends to another.
A: cycle
B: data
C: status
D: cutover

15. The ____ cutover approach causes the changeover from the old system to the new system to occur immediately when the new system becomes operational.
A: direct
B: parallel
C: pilot
D: phased

16. Typically, a higher-level module, called a ____ module, directs lower-level modules.
A: control
B: terminal
C: iteration
D: method

17. The environment for the actual system operation is called the ____ environment.
A: operational
B: production

C: either a. or b.
D: neither a.  nor v.

18. ____ can be used to model business logic for an information system.
A: Decision tables
B: Decision trees

C: either a. or b.
D: neither a.  nor b.
19. Defect tracking software documents and tracks replacement code, called ____.
A: stubs
B: units

C: flags
D: patches
20. A module consists of related program code organized into ____ units that are easy to understand and maintain.
A: small
B: large
C: either a.  or b.
D: neither a.  nor b.
21. Testing two or more programs that depend on each other is called integration testing, or ____ testing.
A: stub
B: desk
C: loop

D: link
22. More recently, the Software Engineering Institute established a new model, called Capability Maturity Model ____, that integrates software and systems development into a much larger framework called process improvement.
A: International
B: Cohesion
C: Process

D: Integration
23. Objects contain both data and program logic, called ____.
A: methods
B: conditions
C: attributes
D: tests
24. During systems implementation, the ____ serves as a blueprint for constructing the new system.
A: system design specification
B: RFQ
C: RFP
D: system structure chart

25. A condition line indicates that a control module determines which ____ modules will be invoked, depending on a specific condition.
A: parent
B: peer
C: subordinate
D: pilot
26. The ____ operation changeover method requires that both the old and the new information systems operate fully for a specified perioD:
A: direct
B: parallel
C: pilot
D: phased

27. A successful information system requires ____ for users, managers, and IT staff members so people understand the system and know how to use it effectively.
A: tracking
B: flowcharting
C: code reviews
D: training
28. Structured application development usually involves a ____ approach, which proceeds from a general design to a detailed structure.
A: bottom-up

B: top-down
C: parallel process
D: parent-child

29. Compiling the program using a CASE tool or a language compiler detects syntax errors, which are ____ errors.
A: cycle
B: math data
C: testing
D: language grammar

30. The main objective of ____ is to avoid problems or to detect them as soon as possible.
A: systems implementation
B: quality assurance
C: status flags
D: partitioning

1 comments:

obaroneastep said...

Casino Games Provider Review - JD H&L Europe Ltd.
Casino 제천 출장샵 Games Provider Review · Top Slots, Blackjack, 안양 출장안마 Roulette · 양산 출장안마 Live Casino 포천 출장마사지 · Table Games · Casino Games · Bingo · 밀양 출장마사지 Roulette · Slots.

Post a Comment